← Back to knowledge center
Inventory and costing·Updated on 2026-11

Product recipes and BOM

Record the materials, standard quantities, waste and piecework processing cost for each product to establish a reliable product cost.

Bill of materials (BOM)FormulaStandard quantityWaste rate
01

Build the product structure

  • Assign each product a unique code and clear specification.
  • List the raw material codes, standard quantity per item and unit of measure required for the product.
  • Units for the same material across products must be convertible; sheets, metres and kilograms cannot simply be added together.
02

Set waste and processing costs

  • Waste rates should be based on historical production or process estimates and regularly compared with actual consumption.
  • Record piecework wages or outsourced processing fees separately from raw material unit prices.
  • When material prices change, determine whether the cost change is caused by purchase price, usage quantity or waste.
03

Version control

  • Record the effective date and reason whenever a recipe changes.
  • Historical costs for completed production should not be overwritten by a new recipe.
  • During trial production, compare standard quantities with actual material issues in a small batch before rolling the recipe out to full production.
Important note

The knowledge base is for learning and day-to-day management reference. For filings, tax treatment or legal obligations, rely on current official rules, regulator guidance and professional accounting advice.